Construction Design 1
The Grange is situated in the
town of

Example
of how the houses will look (Click to view larger version)
The
floor plans of one the three storey houses (Click to view larger version)
Site
Organisation
The developers
are Barratt Homes, who have divided the site into 50 plots of two, three and
four bedroomed houses as well as an apartment block containing 26 two bedroomed
apartments.
Site
Map (Click to view larger version)
At the time of
my site visits, the construction was at an early stage, with construction being
between the setting out stage, and the first floor. A majority of materials were
stored in a designated area surrounded by a fence for security, whereas other
more important materials and equipment were stored in large crates walk-in
containers.
This ensured
security, and protection against the elements. Access to the site through the
access road had metal fences to keep intruders off. In the centre of the site
were the main facilities for workers including a staff room, toilets and the
site managers office.
Safety
Any person
entering the site must wear the appropriate personal protection. This includes
safety shoes, a luminous jacket and a hard hat. Workers must also wear any
protective equipment clothing depending on the job being done.
